Top information

Analysis of Bench Crest Performance at the Yellowstone ,

Analysis of Bench Crest Performance at the Yellowstone Mine: A Case Study J Whyatt1, , An attempt was made to explore the effects of blasting on the bench model by weakening fracture strength The friction angle was decreased from in situ to saw-cut values and the...

Effects of Rock Mass Conditions and Blasting Standard on ,

On the other hand, quite a few clay strata was observed at Mine D Table 1 shows the general blasting standards of each mine Figure 1 shows the procedures of field tests At first, the blast holes and observation holes drilled in vertical , Mine D Face 1-3 Bench height (m) 10 15 13 15 15 15 10 10 Bench angle(deg) 70 70 70 70 70 70 70 70 ....

Rock fragmentation control in opencast blasting ,

Rock fragmentation control in opencast blasting , The objective of a blasting engineer in a mine is to generate a suitable muck pile having suitable size distribution of the rock that can be efficiently loaded, , (burden × spacing × bench height), and Q is the mass in kg of TNT equivalent explosives per hole Cunningham (1983) ....

CONSIDERATIONS IN THE OPTIMISATION OF BENCH FACE ,

height, bench face angle and berm width can be used in the slope design The bench , Other considerations for bench height and berm width are equipment size, ore selectivity and blasting design This paper studies the effects of different slope configurations on slope performance as it relates to wedge stability, volume of rock safely ....

A novel powder factor based bench blast design method for ,

A novel powder factor based bench blast design method for large surface coal mines Andrew Clifford Blair , "A novel powder factor based bench blast design method for large surface coal mines" (2015)Doctoral Dissertations 2377 , has yet to create a blast design method specifically tailored for large surface coal mine bench blasting...

Design of controlled blasting (pre-splitting) in Golegohar ,

Test location Southern wall of mine No1, working bench 11, blasting pattern no 168 Materials Iron ore and waste rocks Spacing of joints and cracks Minimum 01 and maximum 15m Location of nearby faults 8 m behind the pre-split row Status of underground water Average water height of ,...

Economic evaluation of optimum bench height in quarries

In general, the distribution of unit cost in a surface mine is demonstrated in Figure 2 (Goergen, 1987), which was used for checking the model study Model study , growing bench height Blasting For the explosive material, 5 per cent Al added ANFO with a density of ,...

ROCK BREAKAGE AND BLAST DESIGN CONSIDERATIONS IN OPENPIT ,

Oct 12, 2012· Bench height is usually limited on the low end by the height of the stemming column required and its limiting effect on the amount of explosive that can be loaded, and limited on the high end by the height of the digging equipment (for safety reasons)...

The application of a blast audit for production improvement

The application of a blast audit for production improvement SG Giltner DynoConsult, Louisville, KY, USA AE Koski Cliffs Natural Resources, Palmer, MI, USA ABSTRACT: An audit of the blasting operation at a large iron ore mine in North America was used to , such as bench height ,...

Surface Blasting Handbook - mineportalin

The Surface Blasting Handbook has been used with great enthusiasm as a reference in mine blasting training syllabi since it was first published This new edition has been revised to , Per hole = Burden × Spacing × Bench height Per blast = Burden × Spacing × Bench height × Noof hol Surface Blasting Handbook 11 6 Linear Charge Mass ....

Optimization of Blasting Parameters in opencast Mines

OPTIMIZATION OF BLASTING PARAMETERS IN OPENCAST MINES , 2007 OPTIMIZATION OF BLASTING PARAMETERS IN OPENCAST MINES A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF BACHELOR OF TECHNOLOGY IN , The spacing, bench height, burden, charge per hole as depending on the previous parameters can be calculated ....

Estimation of Damage in an Underground Mine Due to ,

204 Estimation of Damage in an Underground Mine Due to Effect of Surface Blasting surface mine bench Peak particle velocity has also been used to evaluate blast damage index at an underground location caused by surface blasting [8]...

Optimized design of drilling and blasting operations in ,

Bowa introduced a practical method in an open pit mine to optimize blasting design parameters such as bench height, drill hole diameter, spacing, etc Tosun and Konak determined a particular charge for blasting operation to reduce operating costs through an experimental method ...

The effects of short delay times on rock fragmentation in ,

Rock fragmentation is a fundamental goal of bench blasting where the most effective blasts can only be achieved through fragmentation optimization The meaning of optimized fragmentation is site dependent, as there is no single fragment size that is the most cost effective for all mine sites, loading equipment, and processing faciliti...

Pc2000 In Gold Mining Preferred Bench Height

mine bench height for blasting crusherasia Moreover, in small open pit gold mines it is feasible to design bench heights up to 75 m since it requires selective mining and the growing bench height Blasting what is the bench hight of chromium mine Crusher South Africa...

DESIGN OF SURFACE BLASTS- A COMPUTATIONAL ,

DESIGN OF SURFACE BLASTS- A COMPUTATIONAL APPROACH , 2514 Dry Blasting Agents 252 EXPLOSIVE CHARACTERISTICS 2521 Physical Properties 2522 Performance Properties , 9 Relationship of bench height, stemming with diameter & UCS of rock for large blast hole 44...

meaning of bench, berm, bench toe in mining « BINQ Mining

meaning of bench, berm, bench toe in mining Posted at:June 17, 2013[ , Improved Blasting and Bench Slope Design at the Aitik Mine , For the preparation of the Mine Workings Plan for the bench/ level being worked within the mapping ....

Open Pit Mining Flashcards | Quizlet

Open Pit Mining -refers to a surface mining method where an ore body is extracted in increments to its economic depth , -bench height and width-ultimate haul road-pit floor slope-berm width and interval , -reduced bench heights require more time for bench prep, drilling, and blasting-bench heights allowing single pass drilling offer better ....

H BLASTING IN SURFACE EXCAVATION - Mining and Blasting

Terminology in bench blasting Free face: This is an exposed rock surface towards which the explosive charge can break out It resembles a wall Face height (H): This is the vertical distance in metres between the top and floor of the bench and should be at least twice the burden (2B)...

mining bench height - jillscityspanl

Evaluation of Optimal Bench Height Selection for , 2 The bench height is the critical function for deciding ore grade composite for the height of the bench applied for mining This paper deals with evaluating the Live Chat; mine bench height for blasting - crusherasia...

Bench - inter-ramp - overall: A guide to statistically ,

and blasting practices such that the bench design may be refined Figure 4 - effect of discontinuity persistence as a function of bench height Figure 5 - comparison of bench face distributions as a function of bench height...

(PDF) Drilling and blasting practices in Nevada's openpit ,

Drilling and blasting practices in Nevada's openpit min , highwall design, bench height and other , and Morell, S, 1999, "Blasting for mine to mill optimization," in Proceedings Explo '99 ....

OPTIMIZATION OF DRILLING AND BLASTING PRACTICES AT ,

BLASTING PRACTICES AT A WESTERN US OPEN PIT COPPER MINE Joel Gadikor Montana Tech Follow this and additional works at:https://digitalcommonsmtechedu/grad_rsch Part of theMining Engineering Commons This Thesis is brought to you for free and open access by the Student Scholarship at Digital Commons @ Montana Tech It has been accepted for...

Selection of practical bench height in open pit mining ,

Selection of practical bench height in open pit mining using a multi-criteria decision making solution , The bench height is a mine-related parameter ...

Blaster's Training Modules - Module 4 - Blasthole Drilling

Hole diameters are matched to blasting bench heights In general, the higher the bench height or cut to be blasted, the larger the blasthole diameter , Thus, for example, the maximum recommended drill-hole diameter for a mine that plans to develop a 60-foot bench would be 60/5 or up to 12 inch From the chart, the range will be 45 to 123 ....

Bench Blasting - Helals

Bench Blasting Bench Blasting Basics Bench blasting consists of drilling holes in the rock at depths, in diameters, and at spacing so that the ANFO (which is a mixture of Ammonium Nitrate[fertilizer] and Fuel Oil [diesel fuel]) as a column charge,together with a bottom charge, can fracture the rock in a controlled manner...

mine bench height for blasting - iidmcoza

ASK MINING: Blasting Practices at Open Cast Min Blasting Practices at Open Cast , if the bench height <6m then blast hole diameter , in extraction from an open cast mine ,...

Explosives - Mining Types

A blasting engineer must consider bench height, pit width, borehole diameter, and geologic formation when designing a cast blast , Kiloton class mine blasts are not uncommon in numerous regions ....

02090 - Blasting Controls - Juneau

Average bench height 3 Hole positions, including angle and depth 4 Blast hole diameters 5 Type and quantity of explosives (including manufacturer's data sheets) , SECTION 02090 - BLASTING CONTROLS STANDARD SPECIFICATIONS FOR CIVIL ENTGINEERING BLASTING CONTROLS December 2003...

Bench Blasting - Blast Parameters for a Specified ,

Notes on Bench Blasting - Blast Parameters for a Specified Vibration Threshold This tool determines the maximum explosive charge for a specified distance, or the minimum distance for a specified charge, for a selected threshold value of peak particle velocity (PPV), given appropriate values of ,...

No.416 Jianye Road, South Jinqiao Area,Pudong New Area, Shanghai, China.

Telephone : +86-21-58386189, 58386176

FAX : +86-21-58385681